Origin of Switchback

NW Mailing List nw-mailing-list at nwhs.org
Tue Apr 20 10:07:59 EDT 2021


When Appalachian Power Company took over the power plant in 1911 it intended to put the power plant in stand-by status. The last year the power plant actually generated power was in 1914. In 1927 it was rebuilt as a distribution center and the power generation plant was removed.  The photograph is a tail track coming off of the relocated Elkhorn Branch that was built about 1950 when the new Maybeury bridge went into operation.

 

Appalachian Power sold the Switchback Distribution facility back to the Pocahontas Fuel Company in 1955 because it was on Pocahontas Fuel property.  

 

Alex Schust

 

-----Original Message-----
From: NW-Mailing-List [mailto:nw-mailing-list-bounces at nwhs.org] On Behalf Of NW Mailing List
Sent: Tuesday, April 20, 2021 3:11 AM
To: NW Mailing List
Subject: Origin of Switchback

 

The origin of Switchback goes back to at least 1892, and presumably to the original construction of the Elkhorn Extension.  Before the Construction of the Ohio Extension, the branch down into Maybeury would have been a true switchback off a dead-end branch instead of just another branch off of a mainline track.

 

Archives drawing HS-H10236, N&W RR drawing 869, shows the word "Switchback" twice. It is applied to the track down to the bottomlands at Maybeury, in the same font as the words "Elkhorn Extension" and the names of various other branches, and also applied to the location between the switch diverges from the Elkhorn Extension main back up -hollow and down-hill to the mines.

https://www.nwhs.org/archivesdb/detail.php?ID=146991

A small excerpt of the full drawing is attached.

 

Archives photo DS00125 is the same photo from the 2Q2014 issue of the Arrow that Chris Dalton mentioned, for those not inclined to dig out their back issues.

https://www.nwhs.org/archivesdb/detail.php?ID=91333

My thinking is that the track probably only reached the substation level and not all the way up to the power plant.

 

I presume the power plant was directly fed by a nearby mine for its entire active lifetime?.

 

Joe Shaw

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20210420/c1d7fe4e/attachment.htm>


More information about the NW-Mailing-List mailing list