Outdoor railway
NW Modeling List
nw-modeling-list at nwhs.org
Thu Mar 17 17:09:34 EDT 2011
Hi Barry;
the short jumpers to each rail can be very small diameter; generally the size chosen is the smallest that is comfortable to handle and solder: 0.3 mm is a good choice. These jumpers should be less than 150mm long. The large buss wires should be 2mm diameter or more, flexible multi strand.
Nigel
----- Original Message -----
From: "NW Modeling List" <nw-modeling-list at nwhs.org>
To: nw-modeling-list at nwhs.org
Sent: Friday, March 18, 2011 4:17:20 AM
Subject: Outdoor railway
Hi
This summer I hope to build a 65 foot circuit on an outdoor layout to run my N & W HO stock. I use DCC. I live in London UK so the climate as ok for this.
My track is Peco code 83. I know that I need to solder jump leads to each piece of rail and wonder if anybody has advice about the thickness of wire needed and how to solder the wire withouit melting the plastic!
Many thanks
Barry Reeves
Songwriter & Musician
www.northwestlondonacousticmusic.co.uk
www.northwestlondonblues.co.uk
________________________________________
NW-Modeling-List at nwhs.org
To change your subscription go to
http://list.nwhs.org/mailman/options/nw-modeling-list
Browse the NW-Modeling-List archives at
http://list.nwhs.org/pipermail/nw-modeling-list/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://six.pairlist.net/pipermail/nw-modeling-list/attachments/20110317/2edef547/attachment-0001.htm>
More information about the NW-Modeling-List
mailing list