Yes, my bad! I should have said 8-1/2 St.

It is easy to see that the signal bridge will soon be history. Thus
the need for the new signals to be in service before the bulk of the
track work can be done.

Ron Davis

At 11:30 AM 2/10/2014, you wrote:

>Ron,

>

>A very minor detail, but, the entrance to the Shops off Campbell

>Ave. is "8 1/2" Street (you knew that!), and the signal locations in

>that area are referred to as 8 1/2 St. (as in ,,,,, Diverging clear

>Main 2 to Main 1 at "8 1/2 Street").

>

>It will be interesting to see how the new panels at N. Jefferson St.

>will be connected. Will Main 1 (Southbound - also called #3 Station)

>be moved northward toward the Station (Link)? I presume the original

>signal bridge at N. Jefferson St. will have to come down (what a shame!).

>

>Thanks for the latest photos



---