N&W 475
    NW Mailing List 
    nw-mailing-list at nwhs.org
       
    Wed Nov  2 22:17:05 EDT 2022
    
    
  
Yes, very sickening. Should be the responsibility of the maintenance   supervisor or leader to make sure the switch is lined and locked so no equipment can enter that track.  It is responsibility of engineer to stop short of equipment on track ahead or misaligned switch.
  Lots of little mistakes leads to accident.  Glad o one was hurt except engineers pride. K. Borg
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221103/d944ca7b/attachment.htm>
    
    
More information about the NW-Mailing-List
mailing list