PUBLIC NOTICE
LOUISIANA DEPARTMENT OF
ENVIRONMENTAL QUALITY (LDEQ)
MURPHY OIL USA, INC.,
MERAUX REFINERY
PUBLIC HEARING AND REQUEST
FOR PUBLIC COMMENT ON
PROPOSED PART 70 AIR
OPERATING PERMIT
MINOR MODIFICATION
The LDEQ, Office of Environmental Services, will conduct a public hearing to
receive comments on a proposed Part 70 air operating permit minor
modification for Murphy Oil USA, Inc., P. O. Box 100, Meraux, LA 70075 for
the Meraux Refinery. The facility is located at 2500 E. St. Bernard Highway,
Meraux, St. Bernard Parish.
The hearing will be held on Tuesday, July 7, 2008, beginning at 6:00 p.m.,
at the Nunez Community College Auditorium, 3710 Parish Road, Chalmette, LA.
During the hearing, all interested persons will have an opportunity to
comment on the proposed permit.
Murphy Oil USA, Inc. requested a minor permit modification to the existing
Permit No. 2500-00001-V4 dated January 15, 2009.
The facility proposes to construct and operate a BenFree Unit (BFU) in order
to comply with the US EPA Mobile Source Air Toxics (MSAT) Phase 2 final rule
requirements finalized on February 26, 2007. This rule will limit the
benzene content of the gasoline produced to an annual average of 0.62
percent by volume. This project will not result in any debottlenecking of
any other unit at the facility. Also, there will not be pure benzene streams
in the unit or in any storage tanks. The off gas from the BFU will be routed
to the existing fuel gas system for control and in an emergency to the
existing North Flare via the Area 6 flare knock out drum. The BFU will
comply with the New Source Performance Standard (NSPS), 40 CFR 60, Subpart
QQQ and National Emission Standards for Hazardous Air Pollutants (NESHAP),
40 CFR 61, Subpart FF. The BFU Reboiler will comply with NSPS, 40 CFR 60,
Subpart J. The facility will voluntarily equip the Reboiler with Ultra-low
NOx burn ers to reduce emissions. The associated fugitives from the BFU will
comply with NSPS, 40 CFR 60, Subpart GGGa. The BFU turnaround emissions
shall also be included in the overall facility turnaround emissions.
In addition Murphy Oil USA, Inc., is modifying the permit as shown below:

1. Update the Crude, Middle Distillate, Heavy Oil, and Slop
Oil Tank CAPs which will result in a reduction of VOC emissions due to the
replacement, reconstruction, or reinstatement of tanks approved in previous
permits (2500-00001-V3 and V4);

2. Consolidation of Gasoline and Naphtha CAPs into one Gasoline/Naphtha CAP;
3. Update fugitive emissions associated with the tanks changes and the BFU
Project;
4. Update the facility turnaround emissions to include the BFU project and
the No. 2 Amine Unit;

5. Cancellation of the rerouting of the Oily Water Stripper
vent stream to the fuel gas system. The Oily Water Stripper vent stream
shall continue to be routed to the North Flare, Emission Point 20-72;

6. Incorporate Boiler B-7 as a permanent equipment in order to meet the
steam demand at the facility;
7. Update the "Specific Requirements" and "Inventories" as appropriate; and

8. Updated Refinery Turnaround Emissions, Emission Point
TRND, based on the planned turnarounds for the duration of this permit which
expires on November 20, 2012.

This permit was processed as an expedited permit in
accordance with LAC 33:I.Chapter 18.

Estimated emission increases due to the BFU Project (Reboiler, Fugitives,
Cooling Tower, North Flare, Storage, BFU turnaround and startup/shutdown,
etc.) based on actual to potential in tons per year are shown in the
following table:
Pollutant
Actual Baseline Emissions
Post Project Emission
BFU Project Increase
PSD De Minimis
PM10
2.30
4.34
2.04
15
SO2
2.10
28.95
26.85
40
NOX
6.52
16.27
9.75
40
CO
35.48
58.73
23.25
100
VOC
16.09
52.98
36.89
40
Estimated emissions increases due to the project are insignificant.
Therefore, PSD review (netting) is not required.
Permitted emissions from the Meraux Refinery in tons per year are as
follows:


Pollutant
Before
After
Change**
PM10
206.40
206.86
+ 0.46
SO2
684.49
725.02
+ 40.53
NOX
1220.06
1224.91
+ 4.85
CO
1960.70
2018.47
+ 57.77
VOC
600.30
637.52
+ 37.22
** Includes emissions increase from the BFU project and refinery turnaround
and startup/shutdown (5 years). The turnaround and startup/shutdown
emissions, in the past, used to be permitted under variances. Including
turnaround and startup/shutdown emissions in the permit will greatly assist
in air quality planning by clearly identifying, quantifying, and limiting
them where necessary. The turnaround and startup/shutdown emissions are not
subject to New Source Review as they are existing emissions and no new
modification is triggering an increase in the associated emissions. A
specific condition has been introduced in this permit to limit the
turnaround and startup/shutdown emissions, Emission Point TRND.
A technical review of the working draft of the proposed permit was submitted
to the facility representative and the LDEQ Surveillance Division. Any
remarks received during the technical review will be addressed in the
"Worksheet for Technical Review of Working Draft of Proposed Permit". All
remarks received by LDEQ are included in the record that is available for
public review.
Written comments or written requests for notification of the final permit
decision regarding this permit may also be submitted to Ms. Soumaya Ghosn at
LDEQ, Public Participation Group, P.O. Box 4313, Baton Rouge, LA 70821-4313.
Written comments and/or written requests for notification must be received
by 12:30 p.m., Thursday, July 9, 2009. Written comments will be considered
prior to a final permit decision.
LDEQ will send notification of the final permit decision to the applicant
and to each person who has submitted written comments or a written request
for notification of the final decision.
The application, proposed Part 70 air operating permit minor modification
and statement of basis available for review at the LDEQ, Public Records
Center, Room 127, 602 North 5th Street, Baton Rouge, LA. Viewing hours are
from 8:00 a.m. to 4:30 p.m., Monday through Friday (except holidays). The
available information can also be accessed electronically on the Electronic
Document Management System (EDMS) on the DEQ public website at
www.deq.louisiana.gov.
An additional copy may be reviewed at St. Bernard Parish Library, 1125 East
St. Bernard Highway, Chalmette, LA.
Individuals with a disability, who need an accommodation in order to
participate in the public hearing, should contact Ms. Barbara Mason at the
above address or by phone at (225) 219-3280.
Inquiries or requests for additional information regarding this permit
action should be directed to Syed Quadri, LDEQ, Air Permits Division, P.O.
Box 4313, Baton Rouge, LA 70821-4313, phone (225) 219-3123.
Persons wishing to be included on the LDEQ permit public notice mailing list
or for other public participation related questions should contact the
Public Participation Group in writing at LDEQ, P.O. Box 4313, Baton Rouge,
LA 70821-4313, by email at deqmaillistrequest at la.gov or contact the LDEQ
Customer Service Center at (225) 219-LDEQ (219-5337).
Permit public notices including electronic access to the proposed permit and
statement of basis can be viewed at the LDEQ permits public notice webpage
at www.deq.louisiana.gov/apps/pubNotice/default.asp and general information
related to the public participation in permitting activities can be viewed
at www.deq.louisiana.gov/portal/tabid/2198/Default.aspx. Alternatively,
individuals may elect to receive the permit public notices via email by
subscribing to the LDEQ permits public notice List Server at
www.doa.louisiana.gov/oes/listservpage/ldeq_pn_listserv.htm.
All correspondence should specify AI Number 1238, Permit Number
2500-00001-V5, and Activity Number PER20090002