No Ben,
What one could choose to be encouraged by is the building of the levee
system, including the 10 ft. back levee- so an overtopping and not a break
is more likely to have a chance of being maintained in the basin as
intended- but lets not be niave- a cat 4 or 5 storm surge will cause some
problems.
Craig
-----Original Message-----
now let me get this strait. we are supposed to cheer for the finishing of a
17 ft levee when the water was 20 to 25 feet. hum to me this doesn't make
sense. what are we cheering for? that we will only get flooded by 5 to 10
feet of water instead of 20 to 25 feet of water. hey hip hip hooray!
Ben